Dredging works:
Dredging of stage (I) out of piling platform up to (-17) .
Dredging of stage (II) post of piling completion (East side of piling platform) up to (-17) away from the piles by 10m as a safe distance.
Dredging of stage (III) post of piling completion (West side of piling platform) up to (-17) away from the piles by 10m as a safe distance.
Client | Engineering Authority of Armed Forces |
Location | Basin 3 SOKHNA PORT , Egypt |
Period | 5 months |
Contract | Remeasurable contract |